Considerations when selecting the right load bank
05Nov
posted by: Andrew Keith, Power Prove
One predicament that could strike fear into any business is a sudden power outage, especially if the back-up system fails to spring into action. Here, Andrew Keith, division director at load bank manufacturer Power Prove, weighs up the options operators have when considering load bank testing.
Known as the five Ps of success, proper planning really can prevent poor performance. While we can’t always predict how things will turn out, being prepared for the worst-case scenario is better than not preparing at all.
Intrigued? Learn more in the Nov 2023 issue of PBSI, here.
Contact Details and Archive...